Mast climbing work platform can also be called climbing type construction lifting platform, is a kind of aerial operation machinery which is driven by gear and rack, is lifted and guided by standard section.
The aerial operation platform is mainly composed of the drive elements, underframe, standard section, tripod mounting deck, rail, wall-attaching rack, electric control system and other spare parts.
And this machinery possesses the following features, like without prefabricated base, large hoisting capacity, high construction efficiency, large working area and safety and reliable.
It can lift the staffs and equipment to the required height and can allow one or more person to work on the platform.
It is especially suitable for the aerial glass wall construction and external wall fixture and fitting, and it is also suitable for hanging ceiling and installing wire duct.
The construction lifting platform is in stable operation and its installation is convenient, and it can be safely operated.
The construction lifting platform is prevailing in the building construction; to some extent, it can replace aerial operation hanging baskets and scaffolds.
Specifications
Description | Single Mast | Double Mast | Mast Section Measures(mm) |
Length(m) | 3.0-10.3 | 8.6-23.6 | 500*500*1580mm 600*600*1580mm Customized |
Width(m) | 1.5-2.5 | 1.5-2.5 |
Distance between two mast center(m) | / | 7.3-13.3 |
Distance between anchors(m) | A≤50m | A>50m | A>50m | A>50m |
6 | 6 | 6 | 6 |
Max. mast height free-standing(m) | 15 | 15 |
Max. mast height anchored(m) | 150 | 150 |
Max. mast height above last anchor(m) | A≤50m | A>50m | A≤50m | A>50m |
8 | 6 | 8 | 6 |
Mast section measures | 700*700*1508mm | 700*700*1508mm |
Max. number of person | 3 | 3 |
Lifting speed(m/min) | 6 | 6 |
Loading capacity(kg) | 2000 | 2000 |
Height of first anchor for ground frame(m) | 3 | 3 |
Height of second anchor for ground frame(m) | 9 | 9 |
Max. height jack chassis min-max(m) | 0.6-0.72 | 0.6-0.72 |
Height platform incl. Fence 1.1m(m) | 1.95 | 1.95 |
Height platform to deck(m) | 0.83 | 0.83 |
Height platform fence upper side mast cover(m) | 2 | 2 |
Number of motors | 2 | 4 |
Motors power mast climbing work | 2.2*2kw | 2.2*4kw |
Max. starting currency | ±60A | ±120A |
Min. supply voltage | 380V |
Power frequency(depends on) | 50/60Hz |
Fuse at building site(slow) | 16A | 25A |
Control voltage | 42Vac |
control voltage frequency | 50/60Hz |
Machine cable | up to 80m:3*6+1*4mm up to 150m:3*10+1*4mm | 3*10mm |
Ms. Kerry Wang
Mob: 86-
E-mail: Kerry (@) china-tdt.com
Thank you very much!
Best regards,
Kerry Wang